South Side Improvements

PrepareYeTheWayLogo2

As another component of our Prepare Ye the Way Capital Campaign, we will be doing a number of major improvements to the South Side of the church property, including:

  • A Memorial Garden
  • A new driveway (entrance and exit from Kimberly Avenue)
  • A new parking lot with handicapped accessibility
  • New stone steps and landscaping at the entry to the graveyard from the new parking lot
  • A new handicapped-accessible level access at the choir room door (no ramp required)
  • A new covered entryway at the choir room door
  • New landscaping (including the addition of at least 7 large trees)!

Target for Completion: 2016

 

 

South Side Improvements